Operator's Manual

Setup
1
InstallingtheFrontRoller
NoPartsRequired
Procedure
Thedethatchingunitisshippedwithoutafrontroller.
Installtherollerusingtheloosepartssuppliedwiththe
dethatchingunitandinstallationinstructionsincluded
withtheroller.
2
AdjustingtheReelBlades
forPositiveSetting(Above
Ground)
NoPartsRequired
Procedure
1.Placethedethatchingunitonalevelsurface.
2.Placeagaugebar,whichhasthedesiredheight
ofbladeaboveground,undereachendofthe
dethatchingunit(Figure3).
g016700
Figure3
1.Gaugebar
3.Withtherearrollercontactingthelevelsurface,
loosenbothheight-of-cutnuts.
4.Rotatetheheight-of-cutuntilbothendsofthe
frontrollercontactthelevelsurface.
5.Verifycontactbyusingapieceofpapertocheck
eachrollerend.
6.Tightenbothheight-of-cutknoblocknuts.
3
AdjustingtheReelBlades
ForNegativeSetting(Below
Ground)
NoPartsRequired
Procedure
Note:Themaximumrecommendednegativesetting
is3/16inch(5mm)deepbladepenetration.
1.Placethedethatchingunitonalevelsurface.
2.Place4gaugebars,settothedesireddepth
ofbladepenetrationbelowground,underthe
frontrollerandrearrollerofthedethatchingunit
(Figure4).
g007064
Figure4
1.Gaugebar(4)
3.Withtherearrollercontactingthelevelsurface,
loosenbothheight-of-cutnuts.
4.Rotatetheheightofcutuntilbothendsofthe
frontrollercontactthelevelsurface.
5.Verifycontactbyusingapieceofpapertocheck
eachrollerend.
5