Service Manual

Workman GTX Gasoline
Drive Train
Page 4 20
7. Install muffler to vehicle (see Exhaust System in the
Service and Repairs section of Chapter 3 Gasoline En-
gine).
8. Install both rear wheel hubs and wheels to the vehi-
cle (see Rear Wheel and Hubs in the Service and Re-
pairs section of Chapter 7 Chassis).
9. Check that forward, neutral and reverse positions
engage as shift lever is moved to each position. If neces-
sary, adjust shift cable at spanner bar so that all posi-
tions engage.
10.Lower vehicle to ground.
11. Install cargo bed to the frame (see Cargo Bed in the
Service and Repairs section of Chapter 7 Chassis).
12.Make sure that transaxle is filled with 1.7 quarts (1.6
liters) of new SAE 80W90 gear oil.
13.Check brakes for proper operation.