Operator's Manual

StartingtheEngine
1.Sitintheoperatorseat,insertthekeyintothe
keyswitch,androtatethekeyclockwisetothe
ONorSTARTposition.
Thereare2modesofstartingthemachine:
PedalStart—turnthekeyswitchtotheON
position,pressdowntheacceleratorpedal,
thenreleaseyourfootfromtheaccelerator
pedal.
Note:Whenyouremoveyourfootfromthe
acceleratorpedal,theengineshutsoff.
KeyStart—turnthekeyswitchtotheSTART
positionandtheengineremainsonuntilthe
isturnedtotheOFFposition.
Note:WhileintheSTARTposition,youcan
engagetheparkingbrakeandworkwhilethe
batteryholdsacharge.
Note:IfyouturnthekeytotheSTARTposition,
theenginecranksuntilitstarts.Iftheengine
cranksformorethan10seconds,returntothe
OFFposition,anddeterminetheissue(e.g.,the
chokecontrolsneedstobeengaged,checkthe
aircleanerforrestrictions,ensurethatthefuel
tankisfull,thesparkisbad,etc.)beforestarting
themachineagain.
Note:Whenequippedwiththeoptionalbackup
alarm,ifyoumovethegear-shiftselectortothe
REVERSEpositionwhenthekeyswitchisinthe
ONorSTARTposition,abuzzersoundstowarn
theoperatorthatthemachineisinreversegear.
2.Movethegear-shiftselectortothedesired
directionoftravelforthemachine.
3.Disengagetheparkingbrake.
4.Slowlystepontheacceleratorpedal.
Note:Iftheengineiscold,pressandholdthe
acceleratorpedalabouthalf-waydown,andpull
thechokeknobouttotheONposition.Return
thechokeknobtotheOFFpositionafterthe
enginewarmsup.
StoppingtheMachine
Important:Whenstoppingthemachineon
anincline,usetheservicebrakestostopthe
machineandengagetheparkingbraketoholdthe
machineinplace.Usingtheacceleratortostall
themachineonthehillcandamagethemachine.
1.Removeyourfootfromtheacceleratorpedal.
2.Slowlypressthebrakepedaltoapplytheservice
brakesuntilthemachinecomestoacomplete
stop.
Note:Thestoppingdistancemayvary
dependingonthemachineloadandspeed.
ParkingtheMachine
1.Stopthemachineusingtheservicebrakesby
pressingandholdingthebrakepedal.
2.Engagetheparkingbrakebypullingthe
parking-brakelevertowardyou.
3.Rotatethekeyswitchcounterclockwisetothe
OFFposition.
4.Removethekeyfromthekeyswitch.
BreakinginaNewMachine
ServiceInterval:Aftertherst100hours—Perform
thebreakinginanewmachine
guidelines.
Performthebreakinginanewmachineguidelines
toprovideproperperformanceandlonglifeforthe
machine.
Checktheuidandengine-oillevelsregularly.
Remainalertforsignsthatthemachineorits
componentsareoverheating.
Afterstartingacoldengine,letitwarmupforabout
15secondsbeforeusingthemachine.
Avoidhardbrakingsituationsfortherstseveral
hoursofnewmachinebreak-inoperation.New
brakeliningsmaynotbeatoptimumperformance
untilseveralhoursofusehascausedthebrakes
tobecomeburnished(broken-in).
Varythemachinespeedduringoperation.Avoid
faststartsandquickstops.
Abreak-inoilforengineisnotrequired.Original
engineoilisthesametypespeciedforregular
oilchanges.
RefertotheMaintenance(page27)sectionfor
anyspeciallowhourchecks.
Checkthefrontsuspensionpositioningandadjust
itifnecessary;refertoAdjustingtheFrontWheel
Toe-in(page46).
24