Service Manual

Workman GTX Electric Page 5 -- 41 Chassis
Disassembly (Fig. 37)
1. Park vehicle on a level surface, turn key switch OFF,
apply parking brake and remove key from the key
switch.
2. Remove seat base assembly with attached seat s
from vehicle.
3. If left hand seat base side is to be removed from vehi-
cle (Fig. 38):
A. Remove onboard battery charger from vehicle
(see Onboard Battery Charger in the Service and
Repairs section of Chapter 3 -- Electrical System).
B. Remove four (4) screws that secure seat base
side to charger bracket (Fig. 38).
C. Support left hand seat base side and remove four
(4) screws t hat secure seat base side to supports il-
lustrated in Figure 37.
D. Remove left hand seat base side from vehicle.
4. Remove remaining seat base panels and supports
from vehicle as needed using Figure 37 as a guide.
5. If needed, remove seats from seat base (Fig. 39).
Assembly (Fig. 37)
1. Secure seats to seat base if they were removed (Fig.
39). Torque cap screws from 90 to 110 in--lb (10.2 to
12.4 N--m).
2. Install all removed seat base panels and supports to
vehicle using Figures 37 and 38 as guides. When secur-
ing seat base supports to vehicle, use torque values
identified in Figures 37 and 38.
3. If onboard battery charger was removed from vehi-
cle, install charger (see Onboard Battery Charger in the
Service and Repairs section of Chapter 3 -- Electrical
System).
4. Install seat base assembly with attached seats to ve-
hicle.
1. Battery charger
2. Screw (4 used)
3. Flange nut (4 used)
4. Charger bracket
5. LH seat base side
6. Screw (4 used)
Figure 38
18 to 22 in--lb
(2.1 to 2.4 N--m)
2
3
6
1
5
4
6
18 to 22 in--lb
(2.1 to 2.4 N--m)
FRONT
1. Seat base
2. Seat (2 used)
3. Cap screw (8 used)
4. Flat washer (8 used)
5. Retainer (2 used)
6. Screw (4 used)
Figure 39
2
3
6
1
5
4
90 to 110 in--lb
(10.2 to 12.4 N--m)
Chassis