Operator's Manual

7.Connecttheremainingwiretothefusedwireon
thenewfuseblock(Figure17).
8.Lowerthebedandconnectthebattery;referto
theOperatorsManual.
9.Installthepreviouslyremovedseatbase.
ForGasoline/PetrolorEFI
Machines
1.Installthenewfuseblockasfollows:
FormachineswithSerialNo.403448001
andbefore,snapthenewfuseblockonto
theexistingfuseblockonthemachine
(Figure17).
FormachineswithSerialNo.403448001
andafter,securethenewfuseblockusing
the2self-tappingscrewsasshowninFigure
21.
g290831
Figure21
1.Self-tappingscrew2.Newfuseblock
2.Connectthelargeconnectoronthenewfuse
blocktotheoptionalpowercableontheexisting
fuseblock(Figure17).
3.Routethewireharnessbehindthecaband
undertheseat,andsecurethecliponthewire
harnesstothesidepanel(Figure19).
4.Installtheblackterminalringtothegroundblock
onthemachine(Figure22).
5.Installtheredpowerwireintoanemptysloton
themachinefuseblock(Figure22).
Note:Installanadditionalfuseblockifthere
arenoremainingslotsopeninafuseblock.
g278776
Figure22
1.Cabwireharness
3.Blackgroundwirewith
spadeterminal
2.Blackgroundwirewith
terminalring
4.Redpowerwirewithspade
terminal
6.Connecttheremainingwiretothefusedwireon
thenewfuseblock(Figure17).
7.Lowerthebedandconnectthebattery;referto
theOperatorsManual.
8.Installthepreviouslyremovedseatbase.
13