Operator's Manual
5
C. For all engine bay service requiring the
removal of the cargo bed, adhere to the
previous removal procedures in Maintenance
Safety Instructions on Page 2.
D. Refer to Workman
®
Operators Manual for
service instructions.
2. Installation of welding gas bottles (for units
equipped with optional Acetylene Tray Kit Model
07224). See page 9 for SET-UP instructions
of Acetylene Tray Kit.
A. Remove cover plate from industrial bed.
B. Remove fasteners securing the Bottle
Restraint Plate at the front left corner of the
cargo bed and set plate aside.
C. Place Oxygen and Acetylene Bottles onto
the Bottle Tray as shown in Figure 5. Tray is
designed for a 38 High Acetylene Tank with
a diameter of 8 1/2 and a 48 high Oxygen
Tank with a diameter of 7 1/2.
D. Secure the bottles to the bed with the bottle
restraint plate. Reinstall 1/2 Flange Lock
fasteners using a torque load of 75 ftlb
(102 Nm).
FIG.
5
1. Oxygen and Acetylene Bottles
2. Bottle Restraint plate 3. Optional Bottle Tray
MAINTENANCE
1
2
3
TORQUE SPECIFICATIONS
Bolt Size ftlb Nm
1/4 100 1125
Bolt Size inlb Ncm
3/8
1/2
30
75
41
102