Installation Instructions

FormNo.3366-590RevA
ElectricBedLiftKit
2011andAfterWorkman
®
MD/MDXUtilityVehicle
ModelNo.07381—SerialNo.311000001andUp
InstallationInstructions
Installation
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
1
Nopartsrequired
PreparetheMachine
Liftbracket,upper
1
Pan-head,Phillipsscrew(3/8x2-1/2
inches)
4
Flangelocknut(Whizlock)(3/8inch)
4
Liftactuator
1
Clevispin
2
2
Cotterpin
2
Installthebedlift.
Switch
1
Thermalfuse,15amp
1
Clevispin(3-1/2inch)
1
3
Cotterpin
1
Installtheswitch
Note:Determinetheleftandrightsidesofthemachine
fromthenormaloperatingposition.
1
PreparingtheMachine
NoPartsRequired
Procedure
1.Positionthemachineonalevelsurface.Setthe
parkingbrake,turntheignitionoff,andremovethe
key.
WARNING
Ifyouleavethekeyintheignitionswitch,
someonecouldaccidentlystartthemachineand
seriouslyinjureyouorotherbystanders.
Removethekeyfromtheignitionswitchbefore
youdoanymaintenance.
2.Lifttheleveroneithersideoftheboxandliftthe
boxup(Figure1).
g014860
1
2
3
Figure1
1.Lever3.Detentslot
2.Proprod
3.Pulltheproprodintothedetentslot,securingthe
box(Figure1).
©2011—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.Toro.com.
OriginalInstructions(EN)
PrintedintheUSA.
AllRightsReserved

Summary of content (4 pages)