Operator's Manual
Note:Ifthetopplates,thenailplate,andthenailsare
currentlyinstalledonthenaildrag,removethem;referto
thenaildragOperator’sManual.
InstallingtheChains
1.Slideachainsleeveovereachchain(Figure2).
G023975
3
4
5
2
6
1
Figure2
1.Dragmat4.Washers
2.Chainsleeve5.Bolt(3/8x1-1/4inch)
3.Locknut
6.Chain
2.Aligntheendofachainwith1oftheouter2holes
inthedragmat.
3.Securethechaintothedragmatwithabolt(3/8x
1-1/4inch),2washers,andalocknut,asshownin
Figure2.
4.Repeatsteps2and3fortheotherside.
InstallingtheDragMat
1.Aligntheendofachainwiththeholeinthebracketon
thatsamesideofthenaildrag(Figure3).
1
4
2
5
G023728
3
Figure3
1.Bolt(3/8x1-1/4inch)
4.Bracket
2.Washers
5.Chain
3.Locknut
2.Securethechaintothebracketwithabolt(3/8x1-1/4
inch),2washers,andalocknut,asshowninFigure3.
3.Repeatsteps1and2fortheotherside.
InstallingtheCarriers
1.Ifthetopplates,thenailplate,andthenailsare
currentlyinstalledonthenaildrag,removethem;refer
tothenaildragOperator’sManual.
2.Aligntheboltholesofacarrierwiththeholesonthe
frontofthebottomplateofthenaildrag(Figure4).
1
2
3
4
G023 727
Figure4
1.Carrier
3.Bottomplate
2.Locknut(2)4.Bolt(3/8x3/4inch),2
3.Install2bolts(3/8x3/4inch)throughtheboltholes
ofthecarrierandthebottomplate,andsecurethem
with2locknuts.
4.Repeatsteps2and3fortheotherside.
2




