Operator's Manual

2.Placeadrainpanunderthelters,removetheold
lters,andwipethelteradaptergasketsurface
clean(Figure60).
2
1
Figure60
1.Hydraulicreturnlter2.Hydraulicchargelter
3.Applyathincoatofhydraulicuidtotherubber
gasketonthereplacementlters.
4.Installthereplacementhydraulicltersontothe
lteradapters.Turntheeachlterclockwiseuntil
therubbergasketcontactsthelteradapter,then
tighteneachanadditional1/2turn.
5.AdduidtotheFullmarkonthedipstick,referto
CheckingtheHydraulicFluid.
6.Starttheengineandletitrunforabouttwominutes
topurgeairfromthesystem.Stoptheengineand
checkforleaks.
7.Recheckthelevelwhiletheuidiswarm.Adduid
toraisetheleveltotheFullmarkonthedipstick,if
required.Donotoverll.
HydraulicSystemTestPorts
Thetestportsareusedtotestthepressureinthe
hydrauliccircuits.ContactyourlocalTorodistributor
forassistance.
TestPortG2(
Figure61)isusedtoassistintrouble
shootingthetractionchargecircuit.
1
2
Figure61
1.TestportG22.TestportG1
TestPortG1(Figure61)isusedtoassistintrouble
shootingtheliftcircuitpressure.
44