Operator's Manual

2.Backthetractorsquarelyuptotheaeratoruntilthe
lowerlinkarmsarealignedwiththehitchpins.
3.MakesurethatthePTOisdisengaged.
4.Engagetheparkingbrake,shutofftheengine,and
removethekeyfromtheignition.Waitforthe
engineandallmovingpartstostopbeforeleavingthe
operator'sseatonthetractor.
Note:Formaximumgroundclearance,thehitchpins
shouldbesecuredinthelowermountingholes(Figure
5).Todeterminewhentousetheuppermounting
holes,refertoConnectingthePTOShaft.
g028741
Figure5
1.Tophole2.Bottomhole
5.Inserttherightandleftlowerlinkarmsontothehitch
pins(Figure6).
g007292
Figure6
1.Lowerlink2.Lynchpin
6.Securethelowerlinkarmstothehitchpinswiththe
lynchpins(Figure6).
3
ConnectingtheUpperLink
Partsneededforthisprocedure:
1Linkpin
1Lynchpin
Procedure
Note:Thefrontoftheaeratormustbeverticalwhile
operatingforbestaerationholequality(Figure7).Adjustthe
upperlinktocontrolthisangle.RefertoOperation(page
19)foradditionalinformation.
g007293
Figure7
1.Connecttheupperlinktothelowerholeinthebracket
andsecureitwiththelinkpinandthelynchpin(Figure
8).
g007294
Figure8
1.Upperlink3.Lynchpin
2.Linkpin4.Locknut
10