Operator's Manual

Figure35
1.Latchhandle3.Unlockedposition
2.Latchhandlepininthe
lockedposition
SoilMoisture
Soilmoisturelevelsbeyondthesaturationpointwill
makeprocessingdifcult.SurfaceMoisturewilltendto
mixwiththeprocessedmaterialandwillcreatesome
buildupandclumpingonthereardischargeareaand
rearrollerscraper.Whenpossible,driercoresprocess
better.Beawarethatinwetconditions,buildupwill
occurinthebrushhousingthatwillrequirethorough
cleanout(Seechart-
Figure36).
28