Operator's Manual

6.Lowertheloaderarm,leavingthe4in1bucketclear
oftheground.
7.Totesttheoperationandinstallationofthevalve
solenoidwiring:
A.Setthethrottletofast.
B.Movetheauxiliaryhydraulicslevertotheforward
ow .
Important:
Onl y operate
thebucketjaws
withtheAuxiliaryHydraulicsLeverin
the
F orw ard F lo w
position.Attemptingto
operatethebucketjawswhileinthedetent
positioncanstoptheengine.
C.Presstherockerswitchinturnontheloader
arm/attachmenttiltlever.Thebucketshould
openandclose.
8.Releasetheauxiliaryhydraulicslevertotheneutral
position.
9.Raisetheloaderarmtothehalfwaypositionandtilt
the4in1bucketfullyforward.Checkthatthereisno
tensiononthevalvemanifoldsolenoidwireharness
attheconnectiontotheloaderarmharness.Ifthere
istension,pullthevalvemanifoldsolenoidharness
throughthecabletiesandthehoseprotectivesleeve
toreducethetension.
10.Tiltthe4in1bucketbackandlowertheloaderarm.
11.Switchofftheengine.
12.Installthevalvemanifoldcovertothe4in1
bucketandsecurewiththesixscrewsandwashers
(Figure20).Tightenthescrewssecurely.
Important:The4in1Bucketmustnotbeused
withoutthevalvemanifoldcoverinstalledand
securedinplace.Thewarrantyonthevalve
manifoldassemblywillbevoidedifthecoveris
notinstalled,orincorrectlyinstalled.
14