Installation Instructions

FORM NO. 3325-810
The TORO Company - 2001
TPS
INSTALLATION
INSTRUCTIONS
GROUNDSMASTER
3000
PART NO. 104-0133
REAR HEIGHT OF CUT KIT
CAUTION
Before servicing or making adjustments to the
machine, stop engine and remove key from
the switch.
MOUNT BUMPER SPACER (Fig. 1 & 2)
1. Remove (2) rivets securing bumper to top of deck
channel (Fig. 1).
Figure 1
1. Bumper
2. Rivet
1
2
2. Position bumper spacer between bumper and
deck channel aligning mounting holes (Fig. 2).
3. Secure bumper and bumper spacer to deck
channel with (2) machine screws and nuts (Fig. 2).
Figure 2
1. Bumper spacer
2. Bumper
1
2
MOUNT HEIGHT-OF-CUT CHAINS
(Fig. 3 & 4)
1. Insert both chains onto U-bolt as shown in
figure 1.
2. Thread a nut onto U-bolt until a distance of
1-1/4" from top of nut to end of U-bolt is attained.
Repeat procedure on other end of U-bolt.
Figure 3
1. Height-of-Cut Chains
2. U-bolt
1
1-1/4" (2)
2
3. Insert a washer onto each end of U-bolt (Fig. 4).
Figure 4
1. Lift arm bracket
2. Deck height-of-cut bracket
1
2
4. Insert U-bolt through holes in lift arm bracket and
secure with (2) washers and nuts (Fig. 4).
5. Start tractor and raise deck to highest possible
position and turn off engine.
6. Position a chain over each side of deck
height-of-cut bracket (Fig. 4).
7. Align height-of-cut chains with hole for desired
height-of-cut, insert clevis pin through (2) washers,
chains and bracket as shown in figure 4. Secure with
hair pin cotter.

Summary of content (3 pages)