Installation Instructions
1
All Rights Reserved
Printed in the USA
2002 by The Toro Company
8111 Lyndale Avenue South
Bloomington, MN 55420-1196
Speedometer Kit
Multi Pro 5600
Part No. 106–1247
Form No. 3328–196
Installation Instructions
Note: This accessory is intended for use on a MULTI PRO 5600 Vehicle equipped with a manual spray system. For
vehicles equipped with Pro Control Spray Systems, the speedometer can be installed to accompany the manual switches,
providing a back–up manual system in case of Pro Control console failure. If the vehicle is equipped with a Pro Control
System, it must be disconnected, and the control console and hole grommet must be removed prior to installing the
speedometer.
1. Install the speedometer in vehicle’s dash as shown in
figure 1.
2. Install speedometer wire harness on the right side of
vehicle following the main vehicle harness. Unplug
the main harness from the wheel motor plug. Connect
speedometer harness to wheel motor plug using the
three pin Weather Pac plug end. Secure wire harness.
3. Under the dash, attach the harness’ two ring terminals
to the coolant gauge on the Multi–Pro 5600 vehicle.
They will share the threaded post of the coolant gauge
with the terminals already connected; red wire ring
terminal to the positive side. (Stud closest to driver
side); Black wire ring terminal to the negative or
ground stud. (Middle stud on the gauge). Remove and
re–use existing nuts and tighten. (Fig. 2).
4. Connect speedometer plug into harness plug.
2
1
Figure 1
1. Coolant gauge 2. Speedometer
1
2
Figure 2
1. Negative or ground (–)
black wire
2. Positive (+) red wire