Installation Instructions
9
InstallingtheSprocketsand
theChain
Partsneededforthisprocedure:
1Largesprocket
1
Chain
1
Smallsprocket
1Idlersprocketassembly
ReplacingtheSmallSprocket
1.Useretaining-ringplierstoremovetheretainingring
fromtheoutputshaftofthetransmission(Figure24).
Note:Keeptheretainingringforinstallingthenew
sprocket.
1
G024404
Figure24
1.Retainingring
2.Removeanddiscardthesmallsprockets.
3.Applyanti-seizelubricanttotheoutputshaftofthe
transmission.
4.Installthenewsmallsprocket,andsecureitwiththe
retainingringthatyouremovedpreviously.
InstallingtheLargeSprocketandthe
Chain
1.Installthebushing,thechain,andthesprocket,and
securethemintopositionwiththe2setscrews(Figure
5).
Important:Alternatebetweenthe2setscrews
asyoutightenthem,sothatthesprocketstays
correctlyaligned.
2.Checkthealignmentofthesprocketsbyplacinga
straightedgeacrossbothofthesprockets(Figure25).
Important:Bothsprocketsmustbealignedwith
thestraightedge,withamaximumdifferenceof
0.57mm(0.022inch).
Ifthesprocketsarenotalignedwithin0.57mm(0.022
inch),loosenthebushingandrepeatsteps1and2.
2
G024540
1
3
Figure25
1.Smallsprocket3.Straightedge
2.Largesprocket
ReplacingtheIdlerSprocket
1.Removethelocknut,thebolt,thebushing,andthe
washersecuringtheidlersprockettothetensioner
assembly(
Figure26).
10










