Installation Instructions

RoutingandConnectingtheWire
HarnesstotheEngine
1.Routthebranchofthewireharnesswiththering
terminalandthe2-socketconnectortowardthe
frontoftheengine.
2.Assembletheringterminalofthewireharness
totheengine(Figure23)withtheange-head
boltthatyouremovedinRemovingtheWire
HarnessfromtheChassis(page6).
g289268
Figure23
1.Engine3.Flange-headbolt
2.Ringterminal(machine
wireharness)
3.Insertthe2-pinconnectorofthevoltage-regulator
harnessintothe2-socketconnectorforthe
machinewireharness(Figure24).
g289140
Figure24
1.2-pinconnector
(voltage-regulator
harness)
2.2-socket(machinewire
harness)
4
InstallingtheTransmission
ReturnandNeutralArms
Partsneededforthisprocedure:
1Torx-headscrew
1Lowerreturnarm
1Upperreturnarm
1Neutralarmandreverseswitch
RemovingtheBidirectionaland
Return-ControlArms
1.Removetheangelocknutandcarriageboltthat
securethetransaxlebrackettothereturn-control
arm(Figure25).
g289448
g289452
Figure25
1.Flangelocknut
3.Carriagebolt
2.Transaxlebracket
11