Form No. 3413-484 Rev A Light Kit TimeCutter® HD Riding Mower Model No. 136-7493 Installation Instructions WARNING CALIFORNIA Proposition 65 Warning This product contains a chemical or chemicals known to the State of California to cause cancer, birth defects, or reproductive harm. Safety Safety and Instructional Decals Safety decals and instructions are easily visible to the operator and are located near any area of potential danger. Replace any decal that is damaged or missing.
Installation Loose Parts Use the chart below to verify that all parts have been shipped. Description Use Qty.
Installing the Front LED Light 3. If you have a machine with a standard platform, install the front light bracket to the front axle tube using the 2 thread-forming screws (5/16 x 3/4) provided with the kit (Figure 3). 1. If you have a machine with a MyRide™ platform, remove the existing 2 thread-forming screws (5/16 x 3/4) securing the bumper brackets (Figure 1). g210247 Figure 3 1. Front axle tube 3. Thread-forming screw (5/16 x 3/4 inch) 2. Front light bracket g210249 Figure 1 1.
Installing the Side LED Light Install the Light Switch 1. Install the light switch bracket using the 2 self-tapping screws (#10 x 1/2 inch) as shown in Figure 7. 1. Secure the side light bracket to the platform using 2 self-tapping hex washer-head bolts as shown in Figure 5. g210324 Figure 7 g210264 Figure 5 1. Platform 1. Light switch bracket 3. Self-tapping hex washer-head bolt 2. Side light bracket 2. Self-tapping screw (#10 x 1/2 inch) 2.
Routing the Wire Harness 1. Beginning from the left side, route the wire harness next to the fuel tank, along the main machine wire harness (Figure 9). 2. Continue routing the wire harness underneath the seat plate, moving toward the controls (Figure 10). 3. Continue routing the wire harness toward the controls (Figure 10). 4. Secure the wire harness to the main machine wire harness using 4 cable ties as shown in Figure 9 and Figure 10. 5.
. From the front of the machine, route the wire harness along the right side of the machine and attach the magnetic tie-wrap mount to the right pivot plate (Figure 11). g210473 Figure 11 7. Continue to route the wire harness along the right side of the machine and secure the wire harness to the lift plate using 2 cable ties (Figure 12).
8. Route the wire harness between the right box control plate and the right deck-lift lever (Figure 13). g210691 Figure 13 9. Connect the front light wire-harness lead to the connector on the wire harness for the light kit (Figure 13).
Routing the Wire Harness Overview For Machines with a Standard Platform Use Figure 14 as an overview for routing the wire harness on a standard platform.
Routing the Wire Harness Overview For Machines with a MyRide™ Platform Use Figure 15 as an overview for routing the wire harness on a MyRide™ platform.
Testing the Lights 1. Turn the key switch to the RUN position. 2. Test the light switch and verify that the lights are operating correctly. 3. If necessary, adjust the lights so that the light casts as desired. 4. Tighten all loose fasteners to complete the installation.
Notes: