Installation Instructions

FormNo.3422-389RevA
RailReplacementKitforGreensmasterFlex2120
TractionUnitwithUniversalGroomer
TransPro100Tow-BehindTrailer
ModelNo.138-4964
InstallationInstructions
Installation
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
Description
Qty.
Use
Lefttubeassembly
1
Righttubeassembly1
Lockbracket2
Installthekit.
Righthexshaft
1
Lefthexshaft
1
Loadthemachine.
Note:Donotdiscardremovedpartsunlessotherwisestated.
1.Removetheloadrampsfromthecrosstubes
ofthetubeassemblies.
2.Removethetubeassembliesfromeachsideof
thetrailer.
Note:Youmaydiscardtheremovedtube
assembliesandthespacersfrombetweenthe
trailerwalls.
3.Installthenewtubeassembliestothewallsof
thetrailerusingthehardwareremovedinstep
2(Figure1).
Note:Positionthenewtubeassembliessothat
thecrosstubesareattherearofthetrailer.
Note:Installtheboltfromtheinsideofthe
trailer.
g251126
Figure1
1.Nut
4.Carriagebolt
2.Washer
5.Crosstube
3.Kittubeassembly
4.Removetheexistinglockbracketsfromeach
sideoftheramp.
Note:Youmaydiscardthelockbrackets.
©2018—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.Toro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3422-389*A

Summary of content (4 pages)