Installation Instructions

4.Installtheredindicatortabtothetopofthe
nozzleandinstallthegreenindicatortabto
theleftsideofthenozzleusingtheprovided
hardwareasshowninFigure4.
g311489
Figure4
1.Redindicatortab
3.Locknut(1/4inch)
2.Hex-socketheadbolt(1/4
x5/8inch)
4.Greenindicatortab
5.Installthechutepositiondecalfacingthe
operator,centeredovertheslotintherotation
gauge(Figure5).
g311490
Figure5
1.Installthechutepositiondecalhere.
3