Operation Manual

Figure43
2.RemoveeachbladeasshowninFigure44.
G016530
1
2
3
4
Figure44
1.Spindle(2)3.Blade(2)
2.Bladedriver(2)4.Bladebolt(2)
3.Inspectthepinsonthebladedriversforwearand
damage.
InstallingtheBlades
1.Installtherstbladesothatitishorizontal,alongwith
allmountinghardwareasshowninFigure44.
Note:Tightentheboltwithyourngers.
Important:Positionthecurvedendsoftheblades
topointtowardthemachinehousing.
Besuretonesttheraisedareasoneachbladedriver
withtherecessesintheheadofitscorresponding
spindle,andthepinsontheothersideofeach
bladedriverwiththeholesinitscorresponding
blade.
2.Steadyeachbladewithaboardandturnthebladebolt
clockwisewithatorquewrenchasshowninFigure45;
torquethebladeboltto82N-m(60ft-lb).
Important:Abolttorquedto82N-m(60ft-lb)is
verytight.Putyourweightbehindthewrenchand
tightentheboltsecurely.Thisboltisverydifcult
toovertighten.
g016537
Figure45
3.Rotatetheinstalledblade1/4turnuntilitisvertical,
andinstalltheotherbladeinthesamemannerasthe
rst(refertostep1).
Note:Thebladesshouldbeperpendicular,forming
aninverted“T”asshowninFigure46.
1
G016536
Figure46
1.Blade(2)
4.Tightenthesecondblade;refertostep2.
5.Rotatethebladesbyhandafull360°turntoensure
thattheydonottouch.
Note:Ifthebladestoucheachother,theyarenot
mountedcorrectly.Repeatsteps1through3untilthe
bladesnolongertoucheachother.
23