Service Manual

G-29
SM-E3B SERIES WSM
G GENERAL
[15] CHECK POINTS OF EVERY 2 YEARS
Replacing Intake Air Line
1. Loosen the clamp (2).
2. Remove the intake air hose (1) and clamp (2).
3. Replace new intake air hose (1) and new clamp (2).
4. Tighten the clamp (2).
NOTEQ
To prevent serious damage to the engine, keep out any dust
inside the intake air line.
W1023867
Replacing Battery
CAUTION
When the battery is being activated, hydrogen and oxygen
gases in the battery are extremely explosive. Keep open
sparks and flames away from the battery at all times,
especially when charging the battery.
When charging battery, remove battery vent plugs.
When disconnecting the cable from the battery, start with
the negative terminal first. When connecting the cable to the
battery, start with the positive terminal first.
Never check battery charge by placing a metal object across
the posts.
1. Disconnect the negative terminal and positive terminal.
2. Remove the battery holder.
3. Remove the used battery.
4. Replace the new battery.
5. Tighten the battery holder.
6. Connect the positive terminal.
7. Connect the negative terminal.
W1023996
Replacing Radiator Hoses and Clamp Bands
CAUTION
Do not remove the radiator cap when the engine is hot. Then
loosen cap slightly to the stop to relieve any excess
pressure before removing cap completely.
1. Drain the coolant.
2. Loosen the clamp bands.
3. Remove the upper hose (1) and lower hose (2).
4. Replace new upper / lower hose (1), (2) and clamp bands.
5. Tighten the clamp bands.
6. Fill with clean water and anti-freeze until the coolant level is just
below the port. Install the radiator cap securely.
W1024178
(1) Intake Air Hose (2) Clamp
(1) Upper Hose (2) Lower Hose
KiSC issued 03, 2011 A