Operator's Manual

Setup
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
Grindercontrollever
1
1
Jamnut1
Installthegrindercontrollever.
2
Nopartsrequired
Checktheuidlevels.
3
Nopartsrequired
Chargethebattery.
1
InstallingtheGrinderControl
Lever
Partsneededforthisprocedure:
1
Grindercontrollever
1Jamnut
Procedure
1.Threadthejamnutontothegrindercontrollever
(Figure4).
Figure4
1.Grindercontrollever
3.4-pinconnector
2.Jamnut
2.Threadthegrindercontrolleverintotherecepticleon
thecontrolpanel(Figure4).
3.Withthetriggerorientedforward,tightenthejam
nutagainstthereceptacletosecuretheleverinplace
(Figure4).
4.Connectthewireonthelevertothe4-pinconnector
underthecontrolpanel(Figure4).
2
CheckingFluidLevels
NoPartsRequired
Procedure
Beforestartingtheengineforthersttime,check
theengineoilandhydraulicuidlevels;referto
CheckingtheEngineOilLevel(page16)and
CheckingtheHydraulicFluidLevel(page16)formore
information.
3
ChargingtheBattery
NoPartsRequired
Procedure
Chargethebattery;refertoChargingtheBattery(page28)for
moreinformation.
11