Operator's Manual
OperatingTips
•Cleantheareaoftrash,branches,androcks
beforetrenchllingtopreventequipmentdamage.
•Forbesttrenchlling,centertheunitoverthe
trench(Figure5).
g013188
Figure5
•Alwaysbegintrenchllingwiththeslowestground
speedpossible.Increasethespeedifconditions
permit.
•Alwaysusefullthrottle(maximumenginespeed)
whentrenchlling.
•Nevertransportthetrenchllerwiththeloader
armsraised.
•Whentrenchlling,theaugershouldjustclearthe
originalgroundsurfacetoobtainmaximumsoil
depositintothetrench.
•Periodicallychecktoensurethattherollersonthe
trenchlleroatareoperatingproperly.
•Whennished,compactthematerialoverthe
trenchtoprepareitforgrading.
8