Operator's Manual

1
G007818
Figure24
1.Reartie-downloops
LiftingtheMachine
Youcanliftthemachineusingthetie-down/liftloops
asliftpoints(Figure23andFigure24).
OperatingTips
Cleantheareaoftrash,branchesandrocksbefore
trenchingtopreventequipmentdamage.
Alwaysbegintrenchingwiththeslowestground
speedpossible.Increasespeedifconditionspermit.
Ifthechainspeedslowsdown,reducegroundspeed
tokeepthechainmovingatitsfastestrate.Donot
spinthetrackswhiletrenching.
Alwaysusefullthrottle(maximumenginespeed)
whentrenching.
Alwaystrenchbackwards(i.e.,inreverse).
Trenchata45to60degreeangleforbestresults.
Youwillbeabletodigatrenchfasterbycontrolling
thedepthwithperiodicadjustmentsoftheboom.
Ifthetrencherbindsinthesoil,reversethechain
direction.Oncethechainisloose,changechain
directionsandcontinuetrenching.
Ifyouneedthenishedtrenchtobecleanerthan
whatispossiblewiththetrencher,youcanpurchase
acrumberfromyourdealer.Thecrumbermounts
ontothetrencherheadandscrapesthetrenchclean
asyoudig.
Toimprovethequalityoftrencheslessthan24inch
(60.9cm)deep,usea24inch(60.9cm)boom.
Usethecorrectchainforthegroundconditions,as
listedinthefollowingtable:
SoilTypeRecommendedChainType
SandySoilchain(re-congurewith
extrateethforaddeddigging
speed;refertoyourAuthorized
ServiceDealer)
SandyLoam/Loam/Loamy
Clay
Soilchain
Wet,stickyclay
Soilchain
Hardsoils:dryclayand
compactedsoils
Combinationchain
Rockysoil/gravel
Rockchain
21