Service Manual

PERIODIC MAINTENANCE 2-11
Periodic Maintenance Procedures
No.1 Cylinder
The left projection [A] on the flywheel is faced with the
right leg [B] on the #1 ignition coil [C] as shown in the
figure.
Check the inlet and exhaust valves are closed completely,
if not, turn the flywheel one turn (360°) clockwise and face
the left projection with the right leg again.
No.2 Cylinder
The left projection [A] on the flywheel is faced with the
right leg [B] on the #2 ignition coil [C] as shown in the
figure. Follow No.1 cylinder alignment.
Then check the valve clearance.
Using a thickness gauge [A], measure the valve clearance
between the rocker arm [B] and the valve stem end.
If the valve clearance is incorrect, adjust it.
Valve Clearance (when cold)
Inlet, Exhaust 0.05 0.10 mm (0.0020 0.0039 in.)
Valve Clearance Adjustment
Since valve repairs change the valve clearance, adjust
the valve clearance to the specified.
Turn the crankshaft in proper direction until the piston is at
the TDC of the compression stroke (as described above).
Loosen the locknut [A] and adjusting bolt [B].
Insert a 0.05 mm (0.0020 in.) thickness gauge [C] be-
tween the rocker arm and valve stem end, and turn the
adjusting bolt until the thickness gauge begins to bind be-
tween the rocker arm and valve stem end. Sweep the
thickness gauge during this adjustment.
Valve Clearance (when cold)
Inlet, Exhaust:
0.05 0.10 mm (0.0020 0.0039 in.)