Operator's Manual

11.Loosenthe2setscrewslocatedontheanged
bearing,andslidethebearingoffoftheshaft.
12.Loosenandremovetheslicer-shaftnutand
pulleyspacerfromtheshaft.
13.Carefullyslidethealternatingbladesand
spacersoffoftheshaft,andreplacethemas
necessary.
14.Reversetheproceduretoinstalltheassembly.
Note:Rotateeachblade1/6turnfromthe
previousblade.
WARNING
Incorrectinstallationofthebladeor
componentsusedtoretainthebladecan
bedangerous.Failuretousealloriginal
componentsandassembledasshown
couldallowabladeorbladecomponent
tobethrownoutfromunderthedeck
resultinginseriouspersonalinjuryor
death.
AlwaysinstallToroblades,bladedrivers,
andbladeboltsasshown.
15.Returnthemachinetotheuprightposition.
16.Connectthewiretothesparkplug.
SeedGateMaintenance
CheckingtheSeedGate
ServiceInterval:Beforeeachuseordaily
Note:Trappeddebrismaypreventtheseedgate
frommovingfreely.
1.Shutofftheengine,waitforallmovingpartsto
stop,andremovethespark-plugwire.Engage
theparkingbrake.
2.Checktoverifythattheseedgatemovesfreely
andisclearofdebris.
3.Iftheseedgatedoesnotopentothestopwhen
theseeder-controlleverisintheONposition,
cleanthegateassembly;refertoCleaningthe
SeedGate(page33).
31