Operator's Manual

Table Of Contents
PassiveDPFRegeneration
Passiveregenerationoccursaspartofnormal
engineoperation.
Whileoperatingthemachine,runtheengineat
full-enginespeedwhenpossibletopromoteDPF
regeneration.
AssistDPFRegeneration
Thecomputertakescontroloftheintakethrottleto
increasethetemperatureoftheengineexhaust.
Whileoperatingthemachine,runtheengineat
fullenginespeedwhenpossibletopromoteDPF
regeneration.
ResetRegeneration
Thecomputertakescontroloftheintakethrottle
andchangesthefuelinjectionoperationto
increasethetemperatureoftheengineexhaust.
Important:Theassist/reset-regeneration
iconindicatesthattheexhausttemperature
dischargedfromofyourmachinemaybe
hotterthanduringregularoperation.
Whileoperatingthemachine,runtheengineat
fullenginespeedwhenpossibletopromoteDPF
regeneration.
ParkedRegenerationand
RecoveryRegeneration
RefertotheSoftwareGuideformoreinformation.
PreparingtoPerformaParkedorRecovery
Regeneration
Ensurethatthemachinehasfuelinthetankforthe
typeofregenerationyouareperforming:
ParkedRegeneration:Ensurethatyouhave
1/4tankoffuelbeforeperformingtheparked
regeneration.
RecoveryRegeneration:Ensurethatyouhave
1/2tankoffuelbeforeperformingtherecovery
regeneration.
Movethemachineoutsidetoanareaawayfrom
combustiblematerials.
RefertotheSoftwareGuidefortheprocedureto
performtheparkedorrecoveryregeneration.
DrillingtheBore
StartingtheFirstPipe
TheSoftwareGuideisusedinthisprocedure.
1.Ensurethatallbystandersareawayfromthe
machineandthattheexit-sidelockoutisON.
2.Movethedrillcarriagefullydownthedrillframe
andspraythespindlethreadswiththreadjoint
compound,thenreturnthedrillcarriagetothe
upperendoftheframe(Figure59).
g023075
Figure64
1.Drillspindle
2.TJC-applicatornozzle
3.Changetherowselectortorow1onthedisplay
torotatethecamassemblytotherstrowinthe
pipeholder;refertotheSoftwareGuide.
4.Lowerthepipeelevatorstoloadapipeintothe
camassembly.
5.Rotatethecamassemblywiththepipetoward
thedrillframe,andextendthepipegrippersuntil
thepipeiscenteredoverthedrillstringandin
frontofthedrillspindleonthecarriage.
6.Raisethepipeelevators.
7.Engagetheexitsidelockoutsystemandrotate
thedrillspindleclockwiseandmovethecarriage
slowlyforwardtoinsertthespindleintothe
femaleendofthepipe(Figure65).
57