Installation Instructions
FormNo.3421-154RevB
PipeBox
2226DirectionalDrill
ModelNo.23821
ModelNo.23821E
InstallationInstructions
RemovingthePipeBox
1.Raisetheelevators.
2.Installthetransportpinsandhitchpinsonthepipebox(Figure1).
g290531
Figure1
1.Upperstraps3.Lockingpins
2.Liftingpoints
4.Transportpins
3.Lowertheelevators.
4.Parkthemachineonalevelsurface,placethethrustframeinthehorizontalposition(ifpossible),shutoff
theengine,andremovethekey.
5.Verifythattheupperstraps(Figure1)areinstalled.
6.Removethelockingpins(Figure1).
7.Routechainsthroughtheliftingpointsandremovethepipeboxwithahoistcapableoflifting2260kg
(5,000lb).
Note:Thepipewillfalloutofthebottomofthepipeboxifthetransportpinsarenotinstalled.
©2019—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.Toro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3421-154*B