Operator's Manual

Thefollowingexampleillustratestheprocessgivenan
installationusingthemachineatan18%pitchonlevel
ground:
Inserttherst3m(10ft)ofdrillbit/pipeintotheground
withnosteering.Theendofthedrillbitwillbe53cm
(21inches)deep(Figure29).
Figure29
1.18%pitch3.96cm(38inches)5.119cm(47inches)
2.53cm(21inches)4.114cm(45inches)6.10.6m(35ft)
Beginsteeringupforthenext3m(10ft),pushingthe
pipesinatthemaximumpitchchangeof8%.Thisresults
inachangeofpitchfrom18%atthebeginningofthe3m
(10ft)to10%attheendofthe3m(10ft)foranaverage
pitchof14%.Giventhat,thedrillheadlowersanother43
cm(17inches)andisnow96cm(38inches)deep.
Continuingsteeringupforthenext3m(10ft)atan8%
pitchchange,yourpitchwillchangefrom10%to2%for
anaveragepitchof6%.Giventhat,thedrillheadlowers
another18cm(7inches)andisnow114cm(45inches)
deep.
Levelingthedrillheadfrom2%to0%takeslessthan1.5
m(5ft)moreforanaldepthof119cm(47inches).
Reachingthisnalpointtook3-1/2pipes3m(10ft)
long.Soforthisexampleyourentrypointshouldbe10.6
m(35ft)backfromthebeginning-at-depthpointofyour
installation.
Important:Youcanusetheinformationcontainedin
thissectiontodetermineboththespaceneededtosteer
uptotheexitpointifneededandalsotosteeraround
obstacles.
MappingtheBore
Withtheinformationyougatheredpreviously,mapoutthe
routeofthebore,identifyingthefollowingsothatyoucan
markthesitelater:
Entrypoint
Locationofthemachineandsupportingequipment
Beginningofboreatdepth
Anyobstaclesthatyouneedtosteeraroundandthe
locationswhereyouneedtostartsteeringtogetaround
orunderthem
Anyutilitylinesthatyouwillneedtocross
Slopeandsoilchangesalongthepaththatwillaffectthe
bore
Endoftheboreatdepth
Exitlocationifdifferentthantheendofthebore
42