Operator's Manual

LoadingDrillPipesintothePipeHolder
Beforeusingthemachine,llthepipeholderwithupto40drillpipes.
Figure33
1.Pipe2.Maleend
3.Clevispins
1.Removetheclevispinsfromthepipeholder(Figure
33).
2.Insertthepipesfromthetopwiththemalethreaded
pipeendstowardthefrontofthemachine(Figure33).
3.Installtheclevispinsbeforedrilling.
Note:Beforedrilling,checktheconditionofthepipesand
replaceanythatarebentordamaged.
AddingFuel
ServiceInterval:Beforeeachuseordaily—Checkthefuel
level.
Useonlyclean,freshdieselfuelorbiodieselfuelswithultra
low(<15ppm)sulfurcontent.Theminimumcetanerating
shouldbe40.Purchasefuelinquantitiesthatcanbeused
within180daystoensurefuelfreshness.
Fueltankcapacity:208L(55U.S.gallons)
Usesummergradedieselfuel(No.2-D)attemperatures
above-7°C(20°F)andwintergrade(No.1-DorNo.
1-D/2-Dblend)belowthattemperature.Usingwintergrade
fuelatlowertemperaturesprovideslowerashpointand
coldowcharacteristicswhichwilleasestartingandreduce
fuellterplugging.
45