Operator's Manual

g023513
Figure48
1.Cam-locklevers
2.Pump-inletcap
2.Insertthehosefromthemixingsystemover
thepumpinlet,andsecureitwiththecam-lock
levers.
SettingupthePumptoUsea
NaturalWaterSource
Tosetupapumptouseanaturalwatersource,you
mustensurethatyouusetheY-screentolterall
materialsotherthanwater.
1.Removethepump-inletcap(Figure49).
g023514
Figure49
1.Pumpthreads3.Y-screen
2.Pump-inletcap
2.AligntheY-screenwiththethreadsonthepump
(Figure49).
3.RotateandtightentheY-screenontothepump.
4.AttachthehosetotheY-screen,andbegin
pumpingfromthenaturalwatersource.
PositioningtheCab(Model
withCabonly)
PositioningtheCabforDrilling
Operation
1.PushbackontheSWING-ROCKERswitch(until
thecabstops)toswingthecabtotheDRILL
position(Figure50).
g025987
Figure50
1.Swingrockerswitch
2.Rotaterockerswitch
Important:Ensurethatyouswingthecab
outcompletelybeforerotating,oryoumay
contactthemachine,causingdamagetothe
cab.
2.PushbackontheROTATE-ROCKERswitchto
rotatethecabtothedesireddrillposition(Figure
50).
PositioningtheCabintoTransport
Mode
1.PushforwardontheROTATE-ROCKERswitch
(untilthecabstops)torotatethecabtothe
TRANSPORTposition(Figure50).
Important:Ensurethatyoucompletely
rotatethecabtotheTRANSPORTposition
(clockwise)beforeswinging,oryoumay
contactthemachine,causingdamagetothe
cab.
2.PushforwardontheSWING-ROCKERswitch
(untilthecabstops)toswingthecabtothe
TRANSPORTposition(Figure50).
57