Operator's Manual

G021912
1
Figure23
1.Sharktooth
1
G021972
Figure24
1.Rockandfrosttooth
ArrangementsoftheDiggingTeeth
Thearrangementofdiggingteethinvolvesbothwhereand
howeachtoothisattachedtothediggingchain.Usethe
followingguidelineswhenyouselectthearrangementsof
teeth:
Installteeththatarethesamewidthandarespaced
equallyaroundthechain.
Usefewerteethonthechainwhenyouareoperatingthe
trencherinwetclayorgumbo.
Usemoreteethonthechainwhenyouareoperatingthe
trencherinsandyloamorrockyground.
Note:Youcanusedifferenttypesandcombinationsofteeth
toincreaseproductivityinvariousdiggingconditions.The
rockandfrostteethorthesharkteethpenetratethesoilwell,
andthecuppedteethhelptoremovethesoil.Tryseveral
combinationstodeterminetheonebestsuitedforyoursite.
CombinationsofBoom,Chain,andTeethforVariousSoilTypesandConditions
SoilTypeChainType
DiggingTeethType
HeavyDuty
Anti-backex
H-Plate
CupCutterRock/Frost
MiningBit
Shark
Mixed
Sand
X
SandyLoam
X
LooseShale
XX
TopsoilX
Caliche(Hard)
XXXXX
Clay(Gumbo)
XX
Coral
XXXX
Rock(Loose)
XXXX
AsphaltXXXX
HardClay
XXXXX
FrozenSoil
XXXXX
Note:Youneedarockwheeltocutsolidrockorconcrete.
14