Service Manual

LINKAGE
4-5Floating Deck Mid-Size Service Manual
4
2. Loosely install the jam nut onto the adjusting screw
(Fig. 0309).
Fig 0309 PICT-1996a
Control Linkage Installation
18. Remove the nut and adjusting screw from the pump
adapter bracket (Fig. 0307).
Fig 0307 PICT-1996a
1. Thread the adjusting screw into the pump adapter
bracket so the threads of the screws protrude 3/4”
(19mm) past the bracket (Fig. 0308).
17. Remove the pump adapter bracket (Fig. 0306).
Fig 0308 PICT-1993a
Fig 0306 PICT-1989