Service Manual

LINKAGE
4-32 Floating Deck Mid-Size Service Manual
4
3. Install a jam nut onto the threads so that there is
approximately 1/4” (6.4mm) space between the jam
nut and the machined nut on the neutral stud (Fig.
0413).
5. Snug the jam nut against the yoke (Fig. 0415).
Fig 0413 PICT-0998a
Fig 0415 PICT-1002a
6. Slide the washer onto the end of the neutral adjust-
ment stud opposite the yoke (Fig. 0416).
4. Thread the yoke onto the neural adjustment stud so
that the end of the stud is ush with the opening of
the yoke (Fig. 0414).
Fig 0416 PICT-1003a
Fig 0414 PICT-1000a