Service Manual

LINKAGE
4-35Floating Deck Mid-Size Service Manual
4
Operator Presence Control Lever
Replacement (Pistol Grip Hydro)
Operator Presence Control Lever Removal
2. Remove the left operator presence control lever from
the operator presence control rod (Fig. 0426).
Fig 0426 PICT-0724
Fig 0424 g. 10 G004912
3. Remove the nylon bushing from the left side of the
OPC rod (Fig. 0427).
1. Loosen and remove the set screw that retains the
left side Operator Presence Control (OPC) lever to
the operator presence control rod (Fig. 0425).
Fig 0427 PICT-0726
Fig 0425 PICT-0722
Note: The manual tube assembly and control panel
cover have been removed for photo purposes.