Service Manual

LINKAGE
4-60 Floating Deck Mid-Size Service Manual
4
12. Remove the clevis pin (Fig. 0524).
Fig 0524 PICT-0915
13. Loosen the 2 set screws securing the drive lever
swivel to the hydro pump shaft (Fig. 0525).
Note: There is an access hole located in the frame
below the drive lever swivel.
11. Remove the hairpin cotter from the clevis pin se-
curing the neutral adjustment stud yoke to the drive
lever swivel (Fig. 0523).
Fig 0525 PICT-0916
Fig 0523 PICT-0914
14. Remove the drive lever swivel from the hydro pump
shaft (Fig. 0526).
Fig 0526 PICT-0917