Service Manual

LINKAGE
4-104 Floating Deck Mid-Size Service Manual
4
45. Route the harness up the left side of the frame and
into the control panel.
46. Install a bolt and nut securing each of the relay
harness connector blocks to the control panel (Fig.
0696).
48. Plug the latching relay into the harness connector
(Fig. 0698).
Fig 0696 PICT-2036
Fig 0698 PICT-2041a
49. Install the hour meter into the control panel (Fig.
0699).
47. Plug the kill relay into the harness connector (Fig.
0697).
Fig 0699 PICT-2039a
Fig 0697 PICT-2035