Service Manual

LINKAGE
4-105Floating Deck Mid-Size Service Manual
4
50. Install the locking tab onto the back side of the hour
meter (Fig. 0700).
52. Plug the harness into the OPC switch (Fig. 0702).
Fig 0700 PICT-2037
Fig 0702 PICT-2028
53. Position the ignition switch into the control panel
(Fig. 0703).
51. Plug the harness into the hour meter (Fig. 0701).
Fig 0703 PICT-2027
Fig 0701 PICT-2029