Service Manual

HYDROSTATIC DRIVE SYSTEM
6-15Floating Deck Mid-Size Service Manual
6
Hydraulic Pump Installation
15. Transfer all 4 ttings to the new pump as well as
the mark indicating the location of one of the high
pressure hydraulic hoses (Fig. 0987). Torque each
tting as noted:
1. Position the pump into the frame so that the pump
shaft is inserted into the control shaft (Fig. 0988).
Fig 0987 PICT-0433a
Fig 0988 PICT-0431
2. Apply thread locking compound to the 2 control shaft
set screws (Fig. 0989).
A. High pressure hose (2) (torque: 34-38 ft-lbs. (46-
51.5 Nm))
B: High pressure hose marking
C: Charge hose tting (torque: 7-10 ft-lbs. (9.5-13.5
Nm) (brass), 15-21 ft-lbs. (20-28.4 Nm) (steel))
D: Drain tting (torque: 25-29 ft-lbs. (34-39 Nm))
Fig 0989 PICT-0435a
A
A
D
D
A
A
B
B
C
C