Service Manual

CHASSIS
3-50 Floating Deck Mid-Size Service Manual
3
10. Position the carrier frame assembly up to the traction
frame (Fig. 0189).
13. Loosely install the 2 upper bolts and nuts securing
the left side of the carrier frame to the left side of the
traction frame (Fig. 0191).
Fig 0189 PICT-1305
Fig 0191 PICT-1303
14. 40”, 48”, 52” and 60” mower decks only: Install the
battery and battery tray assembly. Refer to “Battery
Tray Installation” on page 3-72.
15. 36” mower decks only: Loosely install the 2 upper
bolts and nuts securing the right side of the carrier
frame to the right side of the traction frame (Fig.
0192).
11. Support the carrier frame with a jack stand.
12. Loosely install the lower front bolts on each side of
the chassis securing the carrier frame to the traction
frame (Fig. 0190).
Fig 0192 PICT-2162
Fig 0190 PICT-1300