6. Install retaining ring into groove in bore of PTO gear.
Press two (2) bearings into PTO gear until each bearing
contacts the installed retaining ring.
1. Bearing
2. PTO gear
3. Retaining ring
Figure 70
1
2
3
1
7. Slide three (3) rods into holes in clutch assembly.
8. Slide PTO gear assembly into clutch assembly.
1. Rod (3 used)
2. Clutch assembly
3. PTO gear
Figure 71
1
2
3
9. Assemble PTO shaft:
A. Press new bearing onto PTO shaft so that bear-
ing is flush with shaft shoulder.
B. Alternately place three (3) A–plates and three (3)
friction plates onto PTO shaft.
C. Place C–plate and then B–plate onto shaft.
D. Carefully install two (2) seal rings into grooves of
PTO shaft.
1. Seal ring (2 used)
2. PTO shaft
3. B–plate
4. C–plate
5. A–plate (3 used)
6. Friction plate (3 used)
7. Bearing
Figure 72
1
7
5
2
3
4
5
5
6
6
6