Service Manual

Table Of Contents
Groundsmaster 7200/7210Hydraulic System Page 4 – 72
17.Place two (2) pins into transmission pump housing
holes. Position new gasket to housing.
18.Carefully place gear case housing onto pump hous-
ing making sure to align pins, pipe and shaft bearings.
19.Secure gear case housing to pump housing with fif-
teen (15) flange head screws. Tighten screws evenly in
a crossing pattern and then torque screws from 17 to 19
ft–lb (22 to 27 N–m).
20.Taking care to not damage input shaft oil seal, install
oil seal into gear case housing bore. Place spacer on oil
seal and secure with retaining ring.
1. Gear case housing
2. Pump housing
3. Pin (2 used)
Figure 78
2
1
3
21.Lubricate new O–rings and install O–rings onto three
(3) plugs. Install plugs into transmission assembly.
Torque hex plugs from 14 to 15 ft–lb (18 to 21 N–m) and
socket head plug from 17 to 19 ft–lb (22 to 27 N–m).
1. Hex plug 2. Socket head plug
Figure 79
2
1
1