Service Manual

Table Of Contents
Groundsmaster 7200/7210 Page 7 – 7 Cutting Deck
6. Disconnect end yoke of PTO drive shaft from cutting
deck gearbox shaft (see PTO Drive Shaft Removal in
the Service and Repairs section of Chapter 6 – Chas-
sis). Position and support drive shaft end away from
deck gearbox.
7. Remove four (4) ring pins and clevis pins that secure
deck lift chains to adjustment clevises on cutting deck
(Fig. 3).
8. Slide cutting deck away from machine.
Installation
1. Slide cutting deck under carrier frame of machine.
2. Install four (4) clevis pins and ring pins to secure deck
lift chains to adjustment clevises on cutting deck (Fig. 3).
3. Connect end yoke of PTO drive shaft to cutting deck
gearbox shaft (see PTO Drive Shaft Installation in the
Service and Repairs section of Chapter 6 – Chassis).
4. Start engine and fully raise cutting deck. Stop engine
and remove key from the ignition switch.
CAUTION
Be careful when connecting the pull links to the
machine. The pull link torsion springs may cause
some rotation of pull links during installation.
5. Align pull link to carrier frame and attach link with re-
tainer pin. Secure retainer pin to frame with shoulder
screw (Fig. 1).
6. Install HOC pin into HOC bracket to allow desired
height–of–cut (Fig. 2).
7. Install fuse F1 (15 amp) into fuse block.
Cutting
Deck