Installation Instructions

1
All Rights Reserved
Printed in the USA
2003 by The Toro Company
8111 Lyndale Avenue South
Bloomington, MN 55420-1196
Service Cutting Unit
Groundsmaster 4100–D
Model No. 30418–230000001 & Up
Form No. 3328–765
Installation Instructions
1. Park the machine on a level surface, lower the cutting
unit to the floor, engage the parking brake, be sure the
traction pedal is in the neutral position and the PTO is
OFF. Shut the engine OFF and remove the key from the
switch.
2. Remove the bolts securing the hydraulic motors to the
deck (Fig. 1). Lift the motors off the deck and lay them
on a clean, out of the way, surface. Do not damage
aluminium couplers.
1
2
2
Figure 1
1. Hydraulic motor 2. Mounting bolts
3. Remove the elastomeric spider from inside each pulley
coupler. Inspect for wear and replace if worn.
Otherwise, retain for re–installation on new deck
(Fig. 2).
1
3
2
Figure 2
1. Spider
2. Spider hub
3. Pulley coupler
Note: Inspect spider hub for wear and replace if worn
(Fig. 2).
4. Disconnect the hydraulic hoses from the wing deck lift
cylinders (Fig. 3).
Important When re–assembling the hydraulic hoses to
the lift cylinders, make sure the O–rings are in place and
the fittings are torqued to 17 to 19 ft–lbs.
2
2
2
1
Figure 3
1. Wing deck lift cylinder 2. Hydraulic hoses
5. Locate and unplug the cutting unit wire harness from
the traction unit wire harness(Fig. 4).Also, remove any
cable ties securing the cutting unit wire harness to any
traction unit components.
2
1
Figure 4
1. Wire harness 2. Cable tie