Operator's Manual

3
RemovingtheExisting
Anti-ScalpRollerandBracket
NoPartsRequired
Procedure
1.Cleantheareaaroundtheright,rearanti-scalpwheel.
2.Removetheanti-scalprollerfromthebracketby
looseningandremovingtheangenut(3/8inch)and
axlebolt(3/8x4-1/2inch)asshowninFigure4.Save
allhardwareforlateruse.
3.Removethethreecarriagebolts(3/8x3/4inch)and
angenuts(3/8inch)securingthebrackettothe
mower(Figure4).
Note:Saveallhardwareforlateruse.
Figure4
1.Anti-scalproller
4.Carriagebolt,(3/8x3/4
inch)
2.Anti-scalpbracket
5.Flangenut,(3/8inch)
3.Bolt,(3/8x4–1/2inch)
6.Mowerdeck
4
InstallingtheBlowerPivotfor
a60inchBagger
Partsneededforthisprocedure:
1Blowerpivot
1Metaltemplate
3
Bolt(3/8x1inch)
3
Locknut(3/8inch)
Procedure
1.Installthemetaltemplate,withthenumber60init,to
themowerdeckwiththepreviouslyremovedcarriage
boltsandnutsusingtheexistingholesinthemower
deck(Figure5).
Makesurethecarriageboltsandnutsaretightandthe
templateistightagainstthemowerdeck.
2.Centerpunchthenewmowerdeckholelocationsusing
the3holesinthetemplate(Figure5).
3.Removethemetaltemplateanddrillthree,1/8inch
diameter,pilotholeswithasharpdrillbit(Figure5).
4.Drillthree,13/32inchdiameter,holesintothepilot
holeswithasharpdrillbit(Figure5).
7