Service Manual

LINKAGE
4-13Fixed Deck Mid-Size Service Manual
4
Fig 145 PICT-5798
Fig 147 PICT-6503
4. Tighten the 2 switch mounting screws to secure the
switch position (Fig. 145).
2. Remove the PTO push/pull knob and jam nut from
the PTO linkage rod (Fig. 147).
Fig 146 PICT-6502
Fig 144 PICT-5802
1. Loosen the jam nut located directly below the PTO
push/pull knob (Fig. 146).
b. Position the switch front to back until the 1/4”
(6.35mm) measurement is achieved (Fig. 144).
PTO Linkage Replacement - Hydro
Drive
Removal