Service Manual

LINKAGE
4-25Fixed Deck Mid-Size Service Manual
4
3. Install the lower nut onto to the choke handle
assembly and tighten it, securing the choke handle
to the choke cable bracket (Fig. 192).
Fig 192 PICT-5397
Fig 194 PICT-5400
5. Slide the choke cable into the upper cable clamp
and loosely clamp the outer cable housing (Fig.
194).
Fig 195 PICT-5402Fig 193 PICT-5381
6. Move the choke control to the open position (Fig.
195).
4. Hook the Z-bend of the choke cable into the choke
control lever (Fig. 193).