Service Manual

LINKAGE
4-51Fixed Deck Mid-Size Service Manual
4
Fig 294 PICT-5543
Note: The operators manual tube has been re-
moved for photo purposes.
1. Loosen and remove the set screw that retains the
left side operator presence control (OPC) lever to
the operator presence control rod (Fig. 294).
Fig 295 PICT-5548
2. Remove the left operator presence control lever from
the operator presence control rod (Fig. 295).
Note: The set screw and lever may need to be heat-
ed up to release thread locking compound.
Operator Presence Control Lever
Replacement - Pistol Grip
Removal
Fig 296 PICT-5549
3. Remove the nylon bushing from the left side of the
OPC rod (Fig. 296).