Service Manual

ELECTRIC START SYSTEM
6 - 4 Single Stage Snowthrower Service Manual
10. Remove the upper shroud leaving the starter rope
attached and position the upper shroud out of the
working area.
11. Remove the two screws on the starter and snip
the tie holding the starter in position (Figure 141).
Figure 141 1854-39
12. Remove the starter assembly, wiring, and starter
switch box.
Installation
Reverse the removal procedures. Note: Incorrect
routing of wire harness can cause electrical shock.
Route and fasten the wire harness away from all
moving parts. The wire tie for the starter must be
tightly secured to the starter.
20” CCR/R TEK STARTER REMOVAL
1. Drain the fuel from the fuel tank using a pump type
siphon. Caution: Ignition of fuel can result in
severe personal injury or death. Store fuel in an
authorized fuel storage container.
2. Remove the three screws holding the control
panel nameplate and let the control panel
nameplate hang by the starter rope (Figure 142).
Figure 142 1854-28
3. Remove the three mounting bolts for the chute
assembly. Note: Some models are equipped
with a manual chute system (Figure 143).
Figure 143 1854-12
4. Remove the gas cap and cover with a clean
plastic bag and rubber band to prevent debris
from entering.
5. Remove the two bolts on the upper shroud and
remove the two bolts on the chute crank rod (if
equipped). Remove the chute crank rod and the
upper shroud assembly.
(A) Screws (B) Wire Tie
A
B
(A) Screws
A
A