Operator's Manual

2
InstallingtheMounting
PlatetotheDebrisBlower
Frame
Partsneededforthisprocedure:
1Mountingplateassembly
4
Bolt(1/2x1-1/4inches)
4
Locknut(1/2inch)
Procedure
1.Removetheboltssecuringthemountingplate
assemblytothecrate(Figure9).
g350906
Figure9
1.Mountingplateassembly
2.Installthemountingplateassemblytothedebris
blowerframewith4bolts(1/2x1-1/4inch)and
4locknuts(1/2inch)andconnecttheblower
driveshafttothesplinedshaftonthemounting
plateassemblybyslidingthequickcoupleronto
theshaft(Figure10).
Note:Usethesecondlowestsetofholeson
eachsideofthemountingplate.
g350942
Figure10
1.Locknuts3.Bolts
2.Mountingplateassembly
3.Torquetheboltsto92to113N∙m(68to82ft-lb).
4.Securethesafetychainstothemountingplate
assembly.
3
PreparingtheTractionUnit
NoPartsRequired
Procedure
Important:Toinstallandoperatethedebris
blower,thetractionunitmustbeequippedwith
theAuxiliaryHydraulicsKit(Model31966)andthe
AccessoryControlKit(Model31994).
1.Parkthetractionunitonalevelsurface.
2.Disengagethepowertakeoffandlowerthe
attachments.
3.Engagetheparkingbrake,shutofftheengine,
removethekey,andwaitforallmovementto
stop.
4.Removethefrontattachment(ifequipped)from
theliftarmsofthetractionunitanddisconnect
theattachmentPTOshaft;refertothetraction
unitOperator’sManual.
Note:Retaintheattachmentmounting
hardwareforuseininstallation.
8